earthwork - Part 1
Finally, finally, finally :-) It started with the excavation work on our property!
On Monday at 8 clock came swiftly to the excavator and started digging with our property. As the afternoon we came to the site was pretty much done for the earth side. And it even looked very good with our soil ...
went there on Tuesday then quickly, our Erdberg grew and the hole for the basement, too. Keller builders and diggers were in agreement that a soil replacement (as required in the soil report) is not necessary and sufficient Clean a thicker layer. Those were great news. By 17 clock was then already prepared everything and it started on time raining.
Our land is now so be ready for the floor plate and our basement :-).
a pinch, we now own at least one carriage hill should If indeed snowing again. But we hope we do not use the need and the weather still holds for a while.